Sign in to follow this  
CashanDraven

Logistics Pipe bug

Recommended Posts

recently set up an auto-rafting center with log pipes for solar panels. However when requesting a solar panel, I'm being told that I'm missing redstone, and tin, even though they are both set up in the tables to be crafted from uu matter. No biggie, make barrels and load them from another set up.

However, it is also requesting for 118 glass fiber cable for some unknown reason. Especially odd considering I'm not using glass fiber in my set up, but gold cable because I had plenty of spares from an earlier project.

I'm wondering if anyone else has encountered something like this.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this