Muridin117 Posted July 16, 2012 Posted July 16, 2012 Hi there, im trying to set up an automatic elevator rail that engages the redstone signal when a cart is coming along the line to ascend, and disengages when the cart reaches the top, allowing for carts to descend. I tried watching a youtube video, but i cannot get it to work as the video showed, that had a RS latch between two receivers. Pictures posted. I am new to tekkit, running a local server over hamachi for myself and a few friends. Tunnel Track Signal control room the redstone wire runs parallel to the elevator track to the top to power the line. Terminus track + signals Shaft Track Any help would be appreciated, as I have been stuck on this for days. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.