Basically, I've been trying to set up a drawbridge that has two sets of drawbridges on either side of a chasm that mean in the middle. I've been trying to do it with the Tinker's Mechwork Signal Terminals, Toggle Latches from ProjectRed-Integration and Pressure Plates.

The issue is, that neither side of the bridge syncs up with the other, so that when one extends, the other retracts or doesn't activate at all.

 

I'm currently working on the premise that everything I've done so far is wrong and I'm starting from scratch, so I'm asking if any of you guys know how to get this concept to work and would you be able to explain it to me?

 

Thank you in advance for any help.

Posted

Hmmm. Seeing your setup would make it easier to understand the scenario. I usually use read alloy wire or rednetcable on my drawbridges and never had an issue with them so far.

  • 1 month later...
Posted

Apologies for how late this reply is. Had some things going on irl so I haven't really had time to play Minecraft.
I believe I've figured out a way to circumvent the issue I'm having, so I'll test it out and get back to you.

Sorry again for leaving you hanging.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...